<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>case-study - old</title>
    <link>http://4305133.hs-sites.com/case-study-old</link>
    <description>case-study - old</description>
    <language>en-us</language>
    <pubDate>Thu, 09 Jul 2026 09:10:29 GMT</pubDate>
    <dc:date>2026-07-09T09:10:29Z</dc:date>
    <dc:language>en-us</dc:language>
    <item>
      <title>Real-time Assurance reporting across Network Rail, Alstom, SPL, and TRU</title>
      <link>http://4305133.hs-sites.com/case-study-old/how-real-time-reporting-improved-management-and-reporting-of-close-calls</link>
      <description>&lt;h4&gt;Key Facts&lt;br&gt;&lt;br&gt;&lt;/h4&gt; 
&lt;ul&gt; 
 &lt;li&gt;&amp;nbsp;Working with Transpennine Route Upgrade (TRU) Alliance Partners, Network Rail, Alstom and SPL&lt;/li&gt; 
 &lt;li&gt;Provides a real-time Field-to-Control Room insight solution that simplifies the complete management&amp;nbsp;&lt;br&gt;and reporting of Close Calls, feeding reports directly to the RSSB.&lt;/li&gt; 
 &lt;li&gt;Automation of workflow resulted in significant reductions in time between reporting and rectifying each&amp;nbsp;Close Call.&lt;/li&gt; 
&lt;/ul&gt; 
&lt;blockquote&gt; 
 &lt;h4&gt;&lt;em&gt;“With eviFie, we have seen a huge reduction in time taken up by repetitive tasks – allowing engineers to focus on making important decisions”&lt;/em&gt;&lt;span style="background-color: #c6c6c6; line-height: 20.7px; color: #404040;"&gt; &lt;/span&gt;&lt;/h4&gt; 
 &lt;p&gt;Craig Wilkinson, Business Development Manager, TRU East&lt;/p&gt; 
&lt;/blockquote&gt;</description>
      <content:encoded>&lt;h4&gt;Key Facts&lt;br&gt;&lt;br&gt;&lt;/h4&gt; 
&lt;ul&gt; 
 &lt;li&gt;&amp;nbsp;Working with Transpennine Route Upgrade (TRU) Alliance Partners, Network Rail, Alstom and SPL&lt;/li&gt; 
 &lt;li&gt;Provides a real-time Field-to-Control Room insight solution that simplifies the complete management&amp;nbsp;&lt;br&gt;and reporting of Close Calls, feeding reports directly to the RSSB.&lt;/li&gt; 
 &lt;li&gt;Automation of workflow resulted in significant reductions in time between reporting and rectifying each&amp;nbsp;Close Call.&lt;/li&gt; 
&lt;/ul&gt; 
&lt;blockquote&gt; 
 &lt;h4&gt;&lt;em&gt;“With eviFie, we have seen a huge reduction in time taken up by repetitive tasks – allowing engineers to focus on making important decisions”&lt;/em&gt;&lt;span style="background-color: #c6c6c6; line-height: 20.7px; color: #404040;"&gt; &lt;/span&gt;&lt;/h4&gt; 
 &lt;p&gt;Craig Wilkinson, Business Development Manager, TRU East&lt;/p&gt; 
&lt;/blockquote&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fhow-real-time-reporting-improved-management-and-reporting-of-close-calls&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Rail</category>
      <pubDate>Wed, 01 Jul 2026 11:27:59 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/how-real-time-reporting-improved-management-and-reporting-of-close-calls</guid>
      <dc:date>2026-07-01T11:27:59Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>How Atkinsréalis Delivered Progressive Assurance</title>
      <link>http://4305133.hs-sites.com/case-study-old/how-atkinsr%C3%A9alis-transformed-wheel-detection-point-reporting-through-digital-assurance</link>
      <description>&lt;p&gt;AtkinsRéalis is a global engineering and nuclear services organisation delivering complex rail, transportation and infrastructure programmes across the UK and internationally.&lt;/p&gt;</description>
      <content:encoded>&lt;p&gt;AtkinsRéalis is a global engineering and nuclear services organisation delivering complex rail, transportation and infrastructure programmes across the UK and internationally.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fhow-atkinsr%C3%A9alis-transformed-wheel-detection-point-reporting-through-digital-assurance&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Rail</category>
      <pubDate>Wed, 01 Jul 2026 10:19:04 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/how-atkinsr%C3%A9alis-transformed-wheel-detection-point-reporting-through-digital-assurance</guid>
      <dc:date>2026-07-01T10:19:04Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>How TransPennine Route Upgrade Alliance delivered Progressive Assurance</title>
      <link>http://4305133.hs-sites.com/case-study-old/customer-success-spotlight</link>
      <description>&lt;p&gt;Our latest video interview with Craig Wilkinson on the TRU Alliance Project.&amp;nbsp;&lt;/p&gt;</description>
      <content:encoded>&lt;p&gt;Our latest video interview with Craig Wilkinson on the TRU Alliance Project.&amp;nbsp;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fcustomer-success-spotlight&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Consultancy</category>
      <pubDate>Thu, 18 Jun 2026 09:42:15 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/customer-success-spotlight</guid>
      <dc:date>2026-06-18T09:42:15Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>Delivering on time and on budget for Network Rail</title>
      <link>http://4305133.hs-sites.com/case-study-old/how-transpennine-route-upgrade-alliance-digitised-posessions-with-evifiles-progressive-assurance</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="http://4305133.hs-sites.com/case-study-old/how-transpennine-route-upgrade-alliance-digitised-posessions-with-evifiles-progressive-assurance" title="" class="hs-featured-image-link"&gt; &lt;img src="https://4305133.hs-sites.com/hubfs/eviFile-logo-_orange.svg" alt="Delivering on time and on budget for Network Rail" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;h4&gt;Overview&lt;/h4&gt; 
&lt;p&gt;&lt;br&gt;&lt;strong&gt;To complete the works successfully within the scheduled time and budget, eviFile has been working in close collaboration with Network Rail and the TRU Alliance partners to align its real-time Field-to-Control Room insight solution to overhaul railway possession activities.&lt;/strong&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="http://4305133.hs-sites.com/case-study-old/how-transpennine-route-upgrade-alliance-digitised-posessions-with-evifiles-progressive-assurance" title="" class="hs-featured-image-link"&gt; &lt;img src="https://4305133.hs-sites.com/hubfs/eviFile-logo-_orange.svg" alt="Delivering on time and on budget for Network Rail" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;h4&gt;Overview&lt;/h4&gt; 
&lt;p&gt;&lt;br&gt;&lt;strong&gt;To complete the works successfully within the scheduled time and budget, eviFile has been working in close collaboration with Network Rail and the TRU Alliance partners to align its real-time Field-to-Control Room insight solution to overhaul railway possession activities.&lt;/strong&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fhow-transpennine-route-upgrade-alliance-digitised-posessions-with-evifiles-progressive-assurance&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Assurance</category>
      <pubDate>Wed, 10 Jun 2026 13:50:19 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/how-transpennine-route-upgrade-alliance-digitised-posessions-with-evifiles-progressive-assurance</guid>
      <dc:date>2026-06-10T13:50:19Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>How SPL Powerlines Delivered Progressive Assurance On Major Rail Project Upgrade</title>
      <link>http://4305133.hs-sites.com/case-study-old/how-spl-powerlines-delivered-progressive-assurance-on-major-rail-project-upgrade</link>
      <description>&lt;h4&gt;Overview&lt;br&gt;&lt;br&gt;&lt;/h4&gt; 
&lt;p&gt;SPL Powerlines UK is one of the leading rail electrification businesses in the UK. The company is an experienced overhead line contractor capable of carrying out all aspects of overhead line construction and maintenance – from foundation level to commissioning, or any mixture of these disciplines, on all rail networks.&lt;/p&gt;</description>
      <content:encoded>&lt;h4&gt;Overview&lt;br&gt;&lt;br&gt;&lt;/h4&gt; 
&lt;p&gt;SPL Powerlines UK is one of the leading rail electrification businesses in the UK. The company is an experienced overhead line contractor capable of carrying out all aspects of overhead line construction and maintenance – from foundation level to commissioning, or any mixture of these disciplines, on all rail networks.&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fhow-spl-powerlines-delivered-progressive-assurance-on-major-rail-project-upgrade&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Rail</category>
      <category>Progressive Assurance</category>
      <pubDate>Wed, 10 Jun 2026 13:49:31 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/how-spl-powerlines-delivered-progressive-assurance-on-major-rail-project-upgrade</guid>
      <dc:date>2026-06-10T13:49:31Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>Improving Safety Management And Reporting</title>
      <link>http://4305133.hs-sites.com/case-study-old/improving-safety-management-and-reporting-across-tru-rail-alliance-partners</link>
      <description>&lt;h4&gt;&lt;strong&gt;Overview&lt;br&gt;&lt;br&gt;&lt;/strong&gt;&lt;/h4&gt; 
&lt;p&gt;&lt;strong&gt;&lt;span&gt;All contractors and designers working across the UK’s rail network are obligated to log and manage Close Calls to successful close out, reporting back to Network Rail and the Rail Safety and Standards Board (RSSB).*&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;h4&gt;&lt;strong&gt;Overview&lt;br&gt;&lt;br&gt;&lt;/strong&gt;&lt;/h4&gt; 
&lt;p&gt;&lt;strong&gt;&lt;span&gt;All contractors and designers working across the UK’s rail network are obligated to log and manage Close Calls to successful close out, reporting back to Network Rail and the Rail Safety and Standards Board (RSSB).*&lt;/span&gt;&lt;/strong&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Fimproving-safety-management-and-reporting-across-tru-rail-alliance-partners&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Rail</category>
      <pubDate>Wed, 10 Jun 2026 13:48:50 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/improving-safety-management-and-reporting-across-tru-rail-alliance-partners</guid>
      <dc:date>2026-06-10T13:48:50Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
    <item>
      <title>Transpennine Route Upgrade</title>
      <link>http://4305133.hs-sites.com/case-study-old/transpennine-route-upgrade</link>
      <description>&lt;h3&gt;&lt;span&gt;Background&lt;/span&gt;&lt;/h3&gt; 
&lt;p&gt;&lt;span&gt;The 122km route Transpennine Route between York and Manchester transported 29 million passengers between 23 stations from 2019-2020. Prior to the upgrade, trains on this route were often slow, crowded and infrequent leading to an unsatisfactory experience for customers.&lt;/span&gt;&lt;/p&gt; 
&lt;p&gt;&lt;span&gt;The upgrade project which is being overseen by Network Rail, the TRU West Alliance, and the TRU East Alliance includes full electrification, upgraded signalling to increase tracks from two to four in places, as well as other upgrades which will improve line speed – resulting in more frequent and shorter journeys for passengers, as well as supporting the goal of a low-pollution, low-carbon emissions network.&lt;/span&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;h3&gt;&lt;span&gt;Background&lt;/span&gt;&lt;/h3&gt; 
&lt;p&gt;&lt;span&gt;The 122km route Transpennine Route between York and Manchester transported 29 million passengers between 23 stations from 2019-2020. Prior to the upgrade, trains on this route were often slow, crowded and infrequent leading to an unsatisfactory experience for customers.&lt;/span&gt;&lt;/p&gt; 
&lt;p&gt;&lt;span&gt;The upgrade project which is being overseen by Network Rail, the TRU West Alliance, and the TRU East Alliance includes full electrification, upgraded signalling to increase tracks from two to four in places, as well as other upgrades which will improve line speed – resulting in more frequent and shorter journeys for passengers, as well as supporting the goal of a low-pollution, low-carbon emissions network.&lt;/span&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=4305133&amp;amp;k=14&amp;amp;r=http%3A%2F%2F4305133.hs-sites.com%2Fcase-study-old%2Ftranspennine-route-upgrade&amp;amp;bu=http%253A%252F%252F4305133.hs-sites.com%252Fcase-study-old&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Progressive Assurance</category>
      <pubDate>Wed, 10 Jun 2026 13:47:06 GMT</pubDate>
      <guid>http://4305133.hs-sites.com/case-study-old/transpennine-route-upgrade</guid>
      <dc:date>2026-06-10T13:47:06Z</dc:date>
      <dc:creator>eviFile</dc:creator>
    </item>
  </channel>
</rss>
